Construction study project for the construction of a PV power plant and the associated grid in the Province of Kinshasa 20 MWp + 20 MWh BESS
2024 – 2025
Construction study project for the construction of a PV power plant and the associated network in the Province of Tshopo, City of Kisangani 10 MWp + 15 MWh BESS
2024 – 2025
Site visit and evaluation, Study of civil engineering elements (topography, hydraulics and hydrology, geotechnics), Study of electrical energy demand, Design and sizing of the solar PV power plant, Study of injection into the grid, Economic stud.
Construction study project of a PV power plant and the associated network in the Province of Tshopo, Locality of Basoko 3 MWp + 6 MWh BES
2024 – 2025
Construction study project for the construction of a PV power plant and the associated grid in the Province of Haut-Uele, City of Isiro 9 MWp + 20 MWh BESS
2024 – 2025
Site visit and evaluation, Study of civil engineering elements (topography, hydraulics and hydrology, geotechnics), Study of electrical energy demand, Design and sizing of the solar PV power plant, Study of the injection and extension of the network, Economic study.
Construction study project for the construction of a PV power plant and the associated grid in the Province of Bas-Uele, City of Buta 9 MWp + 20 MWh BESS
2024 – 2025
Construction study project for the construction of a PV power plant and the associated grid in Ituri Province, City of Bunia 9 MWp + 20 MWh BESS
2024 – 2025
Construction study project of a PV power plant and the associated network in the Province of Kasai-Central, City of Kananga 4 MWp + 8 MWh BESS
2024 – 2025
Site visit and evaluation, Study of civil engineering elements (topography, hydraulics and hydrology, geotechnics), Study of electrical energy demand, Design and sizing of the solar PV power plant, Study of the injection into the grid by the substation of the Kananga Thermal Power Plant,Economic study.
Construction study project for the construction of a PV power plant and the associated network in the Province of Kasai-Central, Rural Commune of Luiza 3 MWp + 6 MWh BESS
2024 – 2025
Site visit and evaluation, Study of civil engineering elements (topography, hydraulics and hydrology, geotechnics), Study of electrical energy demand, Design and sizing of the solar PV power plant, MV/LV distribution network design, Economic study.
Construction study project for the construction of a PV power plant and the associated grid in the Province of Kasai-Central, Locality of Dimbelenge 3 MWp + 6 MWh BESS
2024 – 2025
Site visit and evaluation, Study of civil engineering elements (topography, hydraulics and hydrology, geotechnics), Study of electrical energy demand, Design and sizing of the solar PV power plant, MV/LV distribution network design, Economic study
Construction study project for the construction of a PV power plant and the associated grid in the Province of Kasai-Central, Dibaya Territory 4 MWp + 8 MWh BESS
2024 – 2025
Site visit and evaluation, Study of civil engineering elements (topography, hydraulics and hydrology, geotechnics), Study of electrical energy demand, Design and sizing of the solar PV power plant, MV/LV distribution network design, Economic study.
Construction study project for the construction of a PV power plant and the associated network in the Province of Kasai-Oriental, Locality of Tshilenge 3 MWp + 6 MWh BESS
2024 – 2025
Site visit and evaluation, Study of civil engineering elements (topography, hydraulics and hydrology, geotechnics), Study of electrical energy demand, Design and sizing of the solar PV power plant, MV/LV distribution network design, Economic study.
Construction study project for the construction of a PV power plant and the associated network in the Province of Kasai-Oriental, Locality of Kabeya-Kamuanga City 2 MWp + 4 MWh BESS
2024 – 2025
Site visit and evaluation, Study of civil engineering elements (topography, hydraulics and hydrology, geotechnics), Study of electrical energy demand, Design and sizing of the solar PV power plant, MV/LV distribution network design, Economic study.
Construction study project for the construction of a PV power plant and the associated network in the Province of Kasai-Central, Village of Kabeya-Kamuanga Mupompa 1.5 MWp + 4 MWh BESS
2024 – 2025
Site visit and evaluation, Study of civil engineering elements (topography, hydraulics and hydrology, geotechnics), Study of electrical energy demand, Design and sizing of the solar PV power plant, MV/LV distribution network design, Economic study.
Construction study project for the construction of a PV power plant and the associated network in the Province of Kasai, city of Tshikapa 3 MWp + 6 MWh BESS
2024 – 2025
Site visit and evaluation, Study of civil engineering elements (topography, hydraulics and hydrology, geotechnics), Study of electrical energy demand, Design and sizing of the solar PV power plant, MV/LV distribution network design – Economic study.
Construction study project for the construction of a PV power plant and the associated grid in the Province of Lomami, City of Mwene-Ditu 3 MWp + 6 MWh BESS
2024 – 2025
Site visit and evaluation, Study of civil engineering elements (topography, hydraulics and hydrology, geotechnics), Study of electrical energy demand, Design and sizing of the solar PV power plant, MV/LV distribution network design, Economic study.
Construction study project of a PV power plant and the associated grid in the Province of Lomami, City of Kabinda 3 MWp + 6 MWh BESS
2024 – 2025
Site visit and evaluation, Study of civil engineering elements (topography, hydraulics and hydrology, geotechnics), Study of electrical energy demand, Design and sizing of the solar PV power plant, MV/LV distribution network design – Economic study.
Construction study project of a PV power plant and associated grid in Sankuru Province, City of Lusambo 3 MWp + 6 MWh BES
2024 – 2025
Site visit and evaluation; – Study of civil engineering elements (topography, hydraulics and hydrology, geotechnics); – Study of electrical energy demand; – Design and sizing of the solar PV power plant; – MV/LV distribution network design – Economic study
Construction study project of a PV power plant and the associated grid in the Province of Sankuru, Locality of Lubefu 2 MWp + 4 MWh BESS
2024 – 2025
Site visit and evaluation; – Study of civil engineering elements (topography, hydraulics and hydrology, geotechnics); – Study of electrical energy demand; – Design and sizing of the solar PV power plant; – MV/LV distribution network design – Economic study.
Construction study project of a PV power plant and associated grid in the Province of Sankuru, City of Lumumbaville 3 MWp + 6 MWh BESS
2024 – 2025
Site visit and evaluation; – Study of civil engineering elements (topography, hydraulics and hydrology, geotechnics); – Study of electrical energy demand; – Design and sizing of the solar PV power plant; – MV/LV distribution network design – Economic study.